210 Freeway and Baseline Street overpass shut down after water main break – San Bernardino Sun



A water main breach in Highland Friday sent a deluge of water cascading over a freeway bridge, and onto the 210 freeway and forcing its closure in both directions, creating a gnarly mess at the start of rush hour.

Calfire, Caltrans, the CHP and Crews from the East Valley Water District responded to the flooding call about 4 p.m. on Base Line at the westbound 210 freeway on-ramp, said Cal Fire Battalion Chief Sean Landavazo.

San Bernardino County Sheriff’s Department, California Highway Patrol and Caltrans officials along with the East Valley Water District company and TKE Engineering were on scene shortly after the flooding was reported, according to a tweet from Cal Fire.

The water was shut off at 5 p.m., but the freeway remained closed during the ongoing damage assessment. Before motorists can get on their way, the integrity of the bridge must be assessed. Landavazo said once the structural engineer on site determines the bridge is safe, the freeway will be reopened in both directions at Base Line.

“Eight thousand gallons of water was rushing out a minute for almost an hour and a half,” said Terri Kasinga, a spokesperson for Caltrans. The 12-inch water main breached in two places.

The water main was part of the SR 210 Base Line Interchange Project, a joint project between Caltrans, the city of Highland and the San Bernardino County Transportation Authority.

Surrounding businesses and residents were able to keep their water on despite the break. There were no water quality concerns Friday evening, according to a tweet from the East Valley Water District.

Heavy traffic was reported due to the closure.

No additional details were immediately available.

This story is developing. Please check back later for more.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *